There are three periods of test beams in which 3D sensors will be tested at CERN. This page contains a placeholder for notes/reminders for preparation.
MCC board
This is described Description of the board and how to operate it here: MCC boards at SLAC.
- Modification of the Oslo reconstruction code Ole
- Modify the BAT online monitoring Pelle,BAT
...
- expert
- Implement the ATLAS module/MCC in the EUDET framework Georg
- Implement online monitoring capabilities (minimum is correlation plots) for each channel in EUDET framework Georg
- Tests to be done at CERN
- Run source scan with >1 chip, moving the source over the chips to see hits in all attached chips for same source scan Pelle & Alessandro
- Run with BAT software to check monitoring
EUDET Telescope
- Hardware modifications on TPLL Jens
- TPLL boards from Oslo and Manchester are modified, already sent? Ole,Cinzia
- Mount for devices ?
- How many devices can fit in the telescope
10-17 October
DUT's
- List of devices under test
- STA-3D (2E,3E and 4E?)
- Check if the 2E and 4E can be revived Pelle, Alessandro
- CNM
- SINTEF
- FBK (irradiated?)
- STA-3D (2E,3E and 4E?)
...
EUDET Telescope
...
- Hardware modifications on TPLL
- TPLL boards from Oslo and Manchester are modified
- If we use the MCC board only one (with some backup perhaps) needs to be modified
- Software changes
- Minor modification for the Oslo reconstruction code (Ole)
- Need to modify the BAT online monitoring if we use the MCC board.
- How many devices can fit in the telescope
Run plan
Should focus on measurements that require the extra resolutions
...
- List of devices under test
- STA-3D (2E,3E and 4E?)
- CNM
- SINTEF
- FBK (irradiated?)
- Mounting (using BAT either in H6 or H8) ?
- Prefered choice: Use the cooling box prepared for EUDET TB period (above), needed if we test irradiated sensors
- Backup choice is to use box from May even if there is no required cooling
- If irradiated sensors are used then we need to verify the cooling in the box (Anyone?)
- The May cooling box could hold only 4 DUTs, using MCC it is easy feasable to test at least 8 Need new box/mountingNO? required cooling
Run plan
Should focus on the measurements to validate the 3D performance and fill in the information we are lacking from the May TB.
...