  1. Fix HVAC leak:
    • to do: Philippe, talk to Tim to uderstand current status and what to do next.
  2. Phone installtion: DONE
  3. Fiber optic installation:
    • Followed by Jim: Being done.

...

  1. Floor survey for 2.5" embedment: Jim is following upDONE. OK.
  2. Clean machine and computer as well as possible.
  3. Installation:
    • to be done in July.
  4. Calibration (already paid for).
3- Wirebonder: Installation DONE
4- Probe station:
  1. Fabricate anodized aluminium plate:
    • Jim is taking care of it. Plate expected within a few months.
  2. Transfer hood to new plate; replace fabric with rubber flaps (neoprene?).
    • need new plate.
  3. Need rack or table to hold test equipment.
    • to do: have to figure out what is needed: inputs from  Chris and Ryan.
  4. Clean.
  5. Install.

...

  1. Set up glue dispenser
    • Talk to Chris for recommendations
  2. Get supplies for glue dispenser (barrel, centrifuge tubes, syringues, tip assortement):
    • Talk to Chris for recommendations.
  3. Connect vaccum pump to workstations:
    • Jim is taking care of it.
  4. Ground all Terra table: DONE.
8- Bump bonding
  1. Status of stimulus request?
  2. Re-approach joint funding with UCSC, Stanford, SLAC?
  3. Get firm quote on K&S iConn ball bonder/stud bumper

...