- Floor survey for 2.5" embedment:
- Jim is following up
- Clean machine and computer.
- Installation.
- Calibration (already paid for).
3- Wirebonder:
...
Installation DONE
4- Probe station:
- Fabricate anodized aluminium plate:
- Jim is taking care of it. Plate expected within a few months.
- Transfer hood to new plate; replace fabric with rubber flaps (neoprene?).
- need new plate.
- Need rack or table to hold test equipment.
- to do: have to figure out what is needed: inputs from Chris and Ryan.
- Clean.
- Install.
...