The original version of the Group-C to-do list (as of June 17 2009) if from Tim Nelson.

1- Room:
  1. Fix HVAC leak:
    • to do: Philippe, talk to Tim to uderstand current status and what to do next.
  2. Phone installtion: DONE
  3. Fiber optic installation:
    • Followed by Jim: Being done.

2- OGP:

  1. Floor survey for 2.5" embedment:
    • Jim is following up
  2. Clean machine and computer.
  3. Installation.
  4. Calibration (already paid for).

...