The current and planned improvements to the MEC rack and cabling infrastructure are documented in this section. Here are the topics being covered:
Existing configuration:
- Rack map
- Patch panel locations and usage
- Standard configurations
Cabling OIP:
- Project pages on MEC team drive
- Schedule in Smartsheet
7.2.4 Rack map notes and patch panel connections
7.2.2 Configuration for SPL and the August 2024 LPL EMP Tests
...
Graphical Rack Map
See: Rack Map
...