The current and planned improvements to the MEC rack and cabling infrastructure are documented in this section.  Here are the topics being covered:

Existing configuration:

  • Rack map
  • Patch panel locations and usage
  • Standard configurations

Cabling OIP:

  • Project pages on MEC team drive
  • Schedule in Smartsheet

7.2.4 Rack map notes and patch panel connections

7.2.2 Configuration for SPL and the August 2024 LPL EMP Tests

...

Graphical Rack Map

See: Rack Map

...