- ePixM June 15th Beamtime Prep:
- Setup deployment on Wednesday, June 12, 9 am - 12 pm
- Confirmed by Matt Hayes
- Check detector running in DAQ
- Check the fibers connection
- Hardware Prep
- Fiber convertor and thined unit at ASC now
- New power cable ordered by Dawood
- Pinhole holder design
- Need to optimize and prevent light leakage. (Chris Koerber)
- Measurement plan
- softHI and auto: attenuator scan, but sit at one point for a long time (for more stats). How long?? Zoom in on low flux range.
- softHI pinhole re-do: something odd with the data from day1.
- location dependence of effect (Different pinhole position)
- take data that simulates a potential correction algorithm (black out part of the detector)
- make measurement plan sheet before next meeting (Zongde)
- Schedule the staffing;
- next week meeting (Zongde)
- Setting up the pre-setup meeting (include TID)
- Setup deployment on Wednesday, June 12, 9 am - 12 pm
- Stuff to do:
- Look at crosstalk with softHI
- mini-X tests in marrietta
- Status
- Basic script suite for beamtime
- Git training?