  • ssh mec-laser
  • mecpython
  • import meclas
  • meclas.YFE.On() Note: Wait several minutes until the E-drives have turned on before proceeding to the next step. The E-drive turn on is confirmed after a series of chimes are heard. If not in the hutch, then the e-drive turn on can be confirmed by opening scope Lecroy A and changing the state of Long Pulse Laser Operation to 10Hz enable. The 10Hz trace will be visible when the E-drives have turned on (provided SHUTTER 4 on the LSS is open).
    image-2023-7-7_12-52-40.pngimage-2023-7-7_12-54-48.png
  • meclas.LPL.SHG_opt()
  • meclas.LPL.psefc10Hz(numIterQ=50)


This concludes this procedure

...

  • Open Lecroy A scope to monitor 10Hz pulse shape
  • If trace is not present on Lecroy A, make sure that 10Hz operation is enabled.
  • Runmeclas.LPL.psefc10Hz(numIterQ=50) andmeclas.LPL.SHG_opt() after verifying trace is present.