Attendees: 

Steven Back Barry Fishler Jing Yin Nate Landis Tyler Johnson John Cline Zachary L Lentz Robert S. Tang-Kong Peregrine McGehee Ricardo Martinez Martinez Vinod Gopalan Govednik, Janez Janos Vamosi 

Meeting Agenda

Excerpt

Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemLinksNotes

15 40 min

Laser DR Recommendation Responses

https://app.smartsheet.com/reports/5QG4h4wQRRRJ32GVXR3wHr6Hc2Qx33fmG8mJH951

    • Responses should be entered in the "Notes" section. 
    • Controls Rec FY24-DR-16: Need a dedicated system engineer or lead to own the control system flowchart for automation. 
      • Maybe need to start with use-cases. 
      • Need assistance from system engineering team. 
      • Steven would like an example of the automation flowchart from LLNL and LLE. 
      • Workshop - Eric Cunningham would be a good resource to bring in
    • Barry Fishler Nate Landis Jing Yin to add input to recommendations in the "Notes" section. Alex Wallace to review and add input at a later time.  


5 mins

Review Jira Ticket Updates

  • New tickets:
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-26
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-24
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-23
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-22


  • Identify new Jira tickets and call for prioritization
  • Marked top priority items as critical
  • Mitchell Cabral will begin trying to tie due dates to each ticket. 
  • New ticket created to go over installation plan and phasing. 
  • Please enter any additional tickets as necessary. 

40 25 mins

MEC-U Controls FMEA

  • Live document is uploaded to SharePoint. 
  • Starting with failures and causes then will send out to review for mitigations. 
  • Looping in system engineering next week to go over the project's FMEA process and where things will be stored. 

If time permits (we were not able to get to this)

EPICS Archiver


  • What type of data is LLNL hoping to capture with EPICS archiver? 
  • What does LLNL want to do with the data? 
    • Answering will help Zach to start determining what solution can be made to meet LLNL's needs. 
  • Proposal of proof of concept: 

    "This should be at 10Hz, and running a standard GigE Vision configuration (5 cameras per host)".

  • Related ticket
    Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-14

Next Meeting

Date

Objectives


 

  • Continue DAQ discussions.
    • If able, begin writing up some requirements on what the laser systems need. 
  • Chris has a proposal. 
IT Infrastructure Build Requirements Spreadsheet





...