Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

8 cable connections:

  • Water lines to/from chiller x2
  • Glenair signal cable from flange to archon 
  • 1-to-3 breakout controls cable between CryoTel coldhead/flange and cryotel controller 
    • On the controller, one connection. 
    • On the coldhead/flange side, three connections: Two black connectors which go to coldhead, and one db9 connector that goes to the flange. 
  • Cable that goes from CryoTel controller to coldhead 
  • Cat5 from Archon controller to laptop
  • RS232 to USB cable from cryotel controller (RS232) to laptop (USB) 
  • Trigger cable to bottom BNC port on Archon

...