Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

For MFX beam time Phil requested 6 fiber pairs plus spares, eventually 24:

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3992

Dionisio wrote about the fiber pair count requirement for the prototype detector:
Looking at the git repo https://github.com/slaclab/epix-hr-m-320k I would think that the minimum number of fibers is 7 but @Dawood Alnajjar please confirm this

Lane[0].VC[0] = Data[0]
Lane[1].VC[0] = Data[1]
Lane[2].VC[0] = Data[2]
Lane[3].VC[0] = Data[3]

Lane[5].VC[0] = SRPv3
Lane[5].VC[1] = software trigger (ssiCmd)
Lane[5].VC[2] = XVC
-Lane[6].VC[0] = slow monitoring[1:0]
-    [1] = Power and Communication Board
-    [0] = Digital Board


Lane[11] = LCLS-II Timing