Table 1.10 |
|
---|
Area | Physical Location |
---|
Access Buildings |
ACR0 | Accelerator Control Room (B052) |
B005 | Building 5 |
B24 | Building 24 (development) |
B25 | Building 25 (development) |
B34 | Building 34 (development) |
B44 | Building 44 - Klystron Test Lab |
B81 | Building 81 - MMF |
B106 | Building 106 |
B106 | Building 136 |
B911 | Building 911 |
B911 | Building 911 |
B911 | Building 911 |
B921 | Building 921 |
ASTA-UED Facility Area |
AS01 | Accelerator Structure Test System |
Injector Machine Areas |
LR10 | FACET-II Laser Room (Upstairs, near sector 10) |
LR20 | LCLS Laser Room (Upstairs, near sector 20) |
LA20 | FACET Laser Room (Upstairs, near Sector 20) |
IN10 | FACET-II Injector |
IN20 | LCLS Injector |
LINAC Areas |
LI00 | LINAC Sector 0 |
LI20 | LINAC Sector 20 |
LI21 | LINAC Sector 21 |
LI22 | LINAC Sector 22 |
LI23 | LINAC Sector 23 |
LI24 | LINAC Sector 24 |
LI25 | LINAC Sector 25 |
LI26 | LINAC Sector 26 |
LI27 | LINAC Sector 27 |
LI28 | LINAC Sector 28 |
LI29 | LINAC Sector 29 |
LI30 | LINAC Sector 30 |
Beam Switch Yard |
For the entire beam switch yard area spanning from the wooden door to the Muon Shield, the device positions shall range from 100-999, consistently across all beam lines, such that the unit numbers match up in Z-position across all beam lines. |
MCC0 | Main Control Center (B005) OBSOLETE. Replaced with ACR0 |
CLTH | Copper LINAC to Hard Line |
CLTS | Copper LINAC to Soft Line |
BSYH | Beam Switch Yard Hard Line |
BSYS | Beam Switch Yard Soft Line |
BSYA | Beam Switch Yard A-Line |
SLTH | Superconducting LINAC to Hard Line |
SLTS | Superconducting LINAC to Soft Line |
SLTD | Superconducting LINAC to Dump Line |
BSYS | Beam Switch Yard South Arc |
LINAC to Undulator Machine Areas |
LTU0 | LINAC-to Undulator directly after BSY |
LTU1 | LINAC-to-Undulator Line 1 |
Undulator |
UND1 | Undulator on Line 1 |
Dump |
DMP1 | Beam Dump on Line 1 |
Photon Areas |
FEE1 | Front End Enclosure on Line 1 |
NEH1 | Near Experimental Hall on Line 1 |
XRT1 | X-Ray Tunnel on Line 1 |
FEH1 | Far Experimental Hall on Line 1 |
XTA Facility Area |
XT01 | X-Band Test Area |
Global Areas |
SYS0 | LCLS-I System |
SYS1 | FACET and FACET-II System |
SYS2 | LCLS-II System |
SYS3 | LCLS-III System |
SYS4 | NLCTA System |
SYS5 | SPEAR Systems |
SYS6 | X-Band Test Area |
SYS7 | ASTA Test Area |
SYS8 | Klystron Test Lab (B44) |
---|
SYS9 | HE Cryo Test Facility (IR4, etc.) |
---|
SYSW | Global System West |
SYSE | Global System East |
SITE | Remote SLAC Location, not associated with a service building |
GBL0 | Global to all Machines (decommissioned) |