Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Remove the flange sitting on top of the 2 turbos to gain access to the bracket holder port. This secures the umbilical cord located inside the Jungfrau.  

                                         Image ModifiedImage Added

2. 3 silver plated bolts are removed to disengage the bracket holding the umbilical cord. These are no longer capture and release screws. Make sure the foreline is disconnected and all other cables are removed prior to craning. Note: Consult the CXI crane book for the most current lift plan for removing the turbos and check for completion of the daily crane inspection.

                                                                                                               Image Modified


Removal of the attenuator stick:

...