...
Testing results
Additional notes
- Quad module positions on the loaded ring
- Quad flex tests
- Triplet module positions on the loaded ring
- Triplet flex tests
- Ring readout Benfei DP cable tests
- Barrel readout QCEs 8K 10ft miniDP-DP cable tests
Confluence will be down for maintenance June 14 2024 at 6AM PT.
...