Topics to discuss during the meeting (progress):
- Progress for the past week:
- Preparation for beamtime:
- new cable to observe the x-ray pulse and ACQ window directly;
- old firmware;
- what measurements do we need to do at the beamtime;
- what scripts do we need to do for the beamtime?
- Pulser setup:
- progress update;
- new detector (etch 31).
- Enable register reads:
- Register meaning;
- Understand the timing diagram with new (and old if needed) firmware:
- Understand startup sequence:
- GitHub and creation of software depository:
- Time tracking:
- Gabriels presentation.
Meeting notes:
- Overview of progress in last week:
- Philip had received feedback from DAQ crew regarding the start-up sequence for the small epix10ka (LCLS-I) (see presentation). The substeps that happen in the process require further information to evaluate.
- The vertical shifts observed between multiple linearity runs (decreasing flux) for the small was not seen for the quads. A small variation in the switching regions was observed.
- a shift in droped shot pedestal with increased flux inbetween shots was observed by Philip (potential baseline drift).
- Pre