Topics to discuss during the meeting (progress):

  1. Progress for the past week:
  2. Preparation for beamtime:
    • new cable to observe the x-ray pulse and ACQ window directly;
    • old firmware;
    • what measurements do we need to do at the beamtime;
    • what scripts do we need to do for the beamtime?
  3. Pulser setup:
    • progress update;
    • new detector (etch 31).
  4. Enable register reads:
  5. Register meaning;
  6. Understand the timing diagram with new (and old if needed) firmware:
  7. Understand startup sequence:
  8. GitHub and creation of software depository:
  9. Time tracking:
  10. Gabriels presentation.


Meeting notes:

  1. Overview of progress in last week:
    1. Philip had received feedback from DAQ crew regarding the start-up sequence for the small epix10ka (LCLS-I) (see presentation). The substeps that happen in the process require further information to evaluate.
    2. The vertical shifts observed between multiple linearity runs (decreasing flux) for the small was not seen for the quads. A small variation in the switching regions was observed.
    3. a shift in droped shot pedestal with increased flux inbetween shots was observed by Philip (potential baseline drift).