  • Collect walk-ins
  • Notes review
  • Name proposal
    • "The collective" ack. Barry
  • LLE Visit planning
  • ICD Discussion
    • Robert planning to have a discussion about ICD in general with others, what will the format ultimately be.
    • Alex will proceed with preparing the preliminary release for everyone's consideration.
  • Next steps in requirements development
    • Review conops for all parts of the collective, identify all signals and diagnostics that must and would be nice to include in the DAQ stream
      • Consider:
        • What kind of diagnostic data is required for the science mission and the operations needs?
        • Need to determine space and rate constraints of the SLAC EPICS archiver system
          • Working on it
        • How the diagnostic data will be used in the science goals of the facility?
          • This determines what really needs to be included in the DAQ and how synchronously it must be acquired.
        • How the diagnostic data will be used in optimizing and maintaining laser system performance
          • Could the DAQ system be leveraged be used in this regard if the EPICS archiver won't be enough? Jana B. Thayer 
      • This information will help to define our control system infrastructure requirements
    • Controls hardware volume and cable tray estimates
      • Need to develop high-level estimates for all systems in the collective as the cavern dimensions and floorplans are being set right now.
  • Requirements lists

Action items

  •  Follow up with LLE and LLNL AHJ to connect with SLAC EEIP to hopefully get Ch8 requirements satisfied by local authorities, avoid having to redo EEIP upon arrival at SLAC. 
  •  Develop the ICD approver list, send out the preliminary draft to the collective for consideration Alex Wallace 

...