ECS would like to take a moment to emphasize the importance of EEIP at LCLS and SLAC in general and remind anyone reading this newsletter to look into what EEIP is, and how to make sure your equipment is compliant. You can learn more about EEIP here: https://slacspace.slac.stanford.edu/sites/pcd2/eeip/default.aspx 

HE update

Roles and Team update

L2HE Project Roles and assignment table can be found here.

MEC-U update

Rack allocations

We spent some time doing rough estimates of rackspace for MECU, here are some of the figures we developed for your consideration. These don't include the other partner labs in the count, their estimates are elsewhere. Other systems outside of this count include Safety (PPS/BCS/HPS/LSS), Timing and IT infrastructure.

...




XES Controls team continues making progress, advancing instruments’ designs, and ramping up efforts with higher involvement level from instrument’s leads. The goal for the remainder of FY22 will be to refresh the overall cost estimate as recommended by the committee, while at the same time remaining committed to advancing the design maturity of all Accelerator control systems to Preliminary Design Review (60%) level. 

Roles and Team update

L2HE Project Roles and assignment table can be found here.

MEC-U update

Rack allocations

We spent some time doing rough estimates of rackspace for MECU, here are some of the figures we developed for your consideration. These don't include the other partner labs in the count, their estimates are elsewhere. Other systems outside of this count include Safety (PPS/BCS/HPS/LSS), Timing and IT infrastructure.


Full depth racks (42U)Shallow racks (42RU, for small depth devices)
Laser BTS controls42
Xray BTS33
TCX63
TCO42
Total1710

Other controls requirements

More controls requirements were developed in March and April. These requirements were specifically focused on CA network size, DAQ bandwidth, EPICS archiver size and reliability, as well as the logging systems. High-level requirements are being developed as ConOps are updated/ generated. If there is any particularly important requirement of the control system, high-level functionality please let Alex Wallace or Jing Yin know.

LLE+LLNL Onsite Visit

The Rochester and Livermore team came to SLAC on March 22nd and 23rd to learn more about MEC operations and collaborate in person on the project. This was the first time all three partner labs met in person to work on MEC-U. The controls breakout session reviewed the operations and the high-level supervisory control software of the Omega laser facility. We also learned more details about the mechatronics, industrial and timing system controls of the LLE system. 

Hutch Python Update

Hutch python's conda environment was updated to pcds-5.3.1 near the start of April.

You can read

...

Other controls requirements

More controls requirements were developed in March and April. These requirements were specifically focused on CA network size, DAQ bandwidth, EPICS archiver size and reliability, as well as the logging systems. High-level requirements are being developed as ConOps are updated/ generated. If there is any particularly important requirement of the control system, high-level functionality please let Alex Wallace or Jing Yin know.

LLE+LLNL Onsite Visit

The Rochester and Livermore team came to SLAC on March 22nd and 23rd to learn more about MEC operations and collaborate in person on the project. This was the first time all three partner labs met in person to work on MEC-U. The controls breakout session reviewed the operations and the high-level supervisory control software of the Omega laser facility. We also learned more details about the mechatronics, industrial and timing system controls of the LLE system. 

Hutch Python Update

Hutch python's conda environment was updated to pcds-5.3.1 near the start of April.

You can read the full release notes here: PCDS Conda Release Notes: pcds-5.3.1

...

Margaret Ghaly Jyoti, Joshi 


View filenameSpectrometer Arm.mp4height150Image Added


The Spectrometer Arm has been installed and checked out. The spectrometer arm has a total of 27 axes installed with coupled and coordinated motion with strict EPS requirements. The acceptance test went very well with Toyama and even were complete ahead of schedule.

...

  • CXI network upgrade.
  • Switch tool for user management.
  • Diskless server upgrade to provide resilience.
  • Diskless monitoring to make sure all DSS and MON nodes are operational
  • Extra 20 batch nodes for the FEH queue.
  • Finalize the ioc-xrt-rec07 image to validate 10G network.
  • Finalize and validate GNOME key binding shortcuts process.
  • Deploy NoMachine extended capabilities to support remote operations.

Jira

Expand

Jira
serverSLAC National Accelerator Laboratory
columnIdspriority,summary,resolution,created,resolutiondate,reporter,assignee
columnspriority,summary,resolution,created,resolutiondate,reporter,assignee
maximumIssues1000
jqlQueryproject in (LCLSPC, LCLSECSD) AND status in (Done, Closed, Resolved) AND resolved > "2022/3/8" and resolved < "2022/5/8" and resolution not in ("Duplicate", "Won't Do","Won't Fix") AND NOT status changed to Closed during ("2022/1/13", "2022/1/13")
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546

  • DSS and MON nodes are operational
  • Extra 20 batch nodes for the FEH queue.
  • Finalize the ioc-xrt-rec07 image to validate 10G network.
  • Finalize and validate GNOME key binding shortcuts process.
  • Deploy NoMachine extended capabilities to support remote operations.