...
- Trigger Test Runs, Run Database
- End-End testing committee recommendations (LAT-MD-03489)
- Draft Trigger test plan
- GASU based teststands (LAT-TD-03664)
- The LAT Communications Board:
Conceptual Design, Schematics, Programming ICD spec (TD-00860)
Triggering the LAT in the LATTE environment (draft by Jim Panetta) - LAT geometry: SVAC analysis Primer, SVAC geometry page, LAT coordinate system
- ROOT analyses: Digi Variables, Recon Variables
- Gary Godfrey's particle test page containing info on muon telescope and EM1 timing tests
- Hiro Tajima's tracker EM1 test (inc trigger timing issues): Dec/03, Jan/04
...