...
- Set known values on mpod.
- Pin out cable according to diagram.
- Turn off mpod.
- Connect power cable to detector.
- Set operating voltages on mpod.
- Start DAQ and configure to begin idle.
Stabilize for 15 minutes
- For 10k: Wait for temperature < 10C and humidity ~ < 10% (ideally under 5%)
Record Voltage/Current/Temperature Values
...