...
Instructions | Action Fields |
---|---|
Open striptools to monitor magnet temperatures and readbacks | Buttons to open striptools (needs to pass CM/Cavity from background tab) or plots on screen |
Push button to open display for quad magnet control | Super fancy button that takes CM info and passes it to open the e/pydm display or have scripts to do next few steps |
Reset and turn on the power supply. Degauss the magnet by selecting "Degauss" under the Ready menu (horrible instructions, apologies). After the degauss has finished, set BDES to 8.5 and trim. | Scriptify please, need script to check for successful reset/on, degauss and trim and alert the user if any fail |
For the XCOR and YCOR, reset and turn on the power supplies. Set BDES to 8.5 and trim. | script. Same caveats as above. So these will be push buttons to run the scripts? |
Leave the magnets on for at least an hour, monitoring the temps occasionally while continuing the cavity commissioning. After the hour has passed, trim the magnets to 0, then turn off the power supplies. | Script to 0, trim, & off the magnets. |
Take creen screen shots of the temp & readback plots and post to the elog | A button to do this? |