30 min | Status | All | - User start date now 4/27. Need to keep foot on the gas.
- LDAC Report received. Mostly positive, fewer recommendations, aligned with our development path. Will circulate.
- Hansson H1-B approved, looks like mid-March start date.
- Widebody RIXS order got in under the wire at DALSA. Need to focus on ICD/requirements definition.
- JF4M assembly in work. Issues? Parts received? DAQ status?
- ePix10k production work on track, milestone status review Tuesday 1/14.
- Got SparkPix-S sparsification architecture project underway, aiming for a Tixel demonstration.
- Trying to hammer out a collaborative proposal for Hi-Z detector development with BNL...slow process.
- Priorities:
- Jungfrau, Jungfrau, Jungfrau. (review punch list?)
- Calibrations/procedure developments for detector deployments, starting with ePix.
- Wave8 readiness.
- Water leaks in chase??
- RIXS-CCD ICD/requirement definition.
- DAQ rack set-up in chase.
- Seismic table mount components received.
- Status:
- RA: Establishing clean areaSilke help with scheduling interns....do not touch items on big table without asking RA first.
- Need to conclude wiring detail. Each wire should be managed.
- Set up a meeting with Dan, Raj to talk over packaging, strain relief.
- Time on drawings....progress ongoing. Four of the big 5 are out....still need 3-d part...looking at making two copies to test machining in house....submit by end of week?
- Need help with test plan and verification of J-Box plans for install.
- PH: Collaboration meeting in ABQ....PH:
- Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
- Also one on thin-crystal heating at CXI.
- Need to discuss acquiring sensors from UXI collaboration.
- Wiring diagram for Jungfrau (Sameen)
- Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
- UXI options? Nothing until next year....Liam here this week.
- Silke to establish a couple of data streams to examine performance on dropped shots etc.
- EMP testing confusing, un-grounded CSPAD testing this week...test didn't happen.
- Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
- DAQ can run ePix100, ePix10k, Jungfrau....can't yet save data.
Need to check with Chris about data reduction from Run 17.
- Calibration discussions w/ KP.
- Cable drawing standards have been changed....need updates?
- KN:
- KN:
- ePix interlock tests done successfully.
- Need 7 mode PDUs....lupe to make.
- Getting ready for ePixBig test in-hutch on Wednesday to verify hutch is ready to go in Run 18.
- Need to
- get Mike and Dan talking to the JF kit...IoC on top of PSI
scripts. - Chicane for Marietta almost ready to install eGun.
- Need to coordinate 4-fiber Wave8 with CDS...single vs multimode.
- Matt Church helping with Wave8 ?? Need to mount close as possible to flange.
- All JF Cables are in work
ePix10k requires new MPODS, working issue...check again mid November.
- script
- eGun installed in Marietta....need to buy HiCube 80.
- All JF4M Cables are in. Making second umbilical?
- MPOD cables ....need Hi-V cables for ASC and MFX....follow up with Lupe.
- KP:
- Working procedures/calibration with Philip.
- Working docs with Silke for online access
- KZ:
- RIXS-CCD Procedure draft complete. Review at next detector meeting??
- RIXS-CCD setup work
- Toolbox organization/reorder scheme
|