TimeItemWhoNotes
30 minStatusAll
  • User start date now 4/27. Need to keep foot on the gas.
  • LDAC Report received. Mostly positive, fewer recommendations, aligned with our development path. Will circulate.
  • Hansson H1-B approved, looks like mid-March start date.
  • Widebody RIXS order got in under the wire at DALSA. Need to focus on ICD/requirements definition.
  • JF4M assembly in work. Issues? Parts received? DAQ status?
  • ePix10k production work on track, milestone status review Tuesday 1/14.
  • Got SparkPix-S sparsification architecture project underway, aiming for a Tixel demonstration.
  • Trying to hammer out a collaborative proposal for Hi-Z detector development with BNL...slow process.
  • Priorities:
  • Jungfrau, Jungfrau, Jungfrau. (review punch list?)
  • Calibrations/procedure developments for detector deployments, starting with ePix.
  • Wave8 readiness.
  • Water leaks in chase??
  • RIXS-CCD ICD/requirement definition.
  • DAQ rack set-up in chase.
  • Seismic table mount components received.

  • Status:
  • RA: Establishing clean areaSilke help with scheduling interns....do not touch items on big table without asking RA first.
  • Need to conclude wiring detail. Each wire should be managed.
  • Set up a meeting with Dan, Raj to talk over packaging, strain relief.
  • Time on drawings....progress ongoing. Four of the big 5 are out....still need 3-d part...looking at making two copies to test machining in house....submit by end of week?
    • Need help with test plan and verification of J-Box plans for install.
  • PH: Collaboration meeting in ABQ....PH:
      • Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
    • Also one on thin-crystal heating at CXI.
    • Need to discuss acquiring sensors from UXI collaboration.
    • Wiring diagram for Jungfrau (Sameen)
    • Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
    • UXI options? Nothing until next year....Liam here this week.
      • Silke to establish a couple of data streams to examine performance on dropped shots etc.
    • EMP testing confusing, un-grounded CSPAD testing this week...test didn't happen.
    • Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
    • DAQ can run ePix100, ePix10k, Jungfrau....can't yet save data.
    • Need to check with Chris about data reduction from Run 17.
      • Calibration discussions w/ KP.
      • Cable drawing standards have been changed....need updates?

    • KN:
      • Need to
    • KN:
    • ePix interlock tests done successfully.
    • Need 7 mode PDUs....lupe to make.
    • Getting ready for ePixBig test in-hutch on Wednesday to verify hutch is ready to go in Run 18.
    • Need to
      • get Mike and Dan talking to the JF kit...IoC on top of PSI
      scripts.
    • Chicane for Marietta almost ready to install eGun.
    • Need to coordinate 4-fiber Wave8 with CDS...single vs multimode.
    • Matt Church helping with Wave8 ?? Need to mount close as possible to flange.
    • All JF Cables are in work
    • ePix10k requires new MPODS, working issue...check again mid November.
      • script
      • eGun installed in Marietta....need to buy HiCube 80.
      • All JF4M Cables are in. Making second umbilical?
      • MPOD cables ....need Hi-V cables for ASC and MFX....follow up with Lupe.

    • KP:
      • Working procedures/calibration with Philip.
      • Working docs with Silke for online access
    • KZ:
    • RIXS-CCD Procedure draft complete. Review at next detector meeting??
    • RIXS-CCD setup work
    • Toolbox organization/reorder scheme
      • .
5 minBudget Updatemmck
  • M&S Status (initial FY20 not yet posted)

  • Labor snapshot (July actuals):

15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

...