Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Purpose

preferred schedule

Ion

Energy

Rate on CU

Beam focus

Trigger

notes

reference

Test multiple trigger engines prior to beam

nov 16-17

NA

NA

NA

NA

all BTs

change CNO thresholds, periodic frequency

luca

Test multiple trigger engines w beam

nov 18

C

1.5Gev/n

100Hz

any

all BTs

change CNO thresholds, periodic frequency

luca

Monitor beam rate and conditions

nov 18

C

1.5Gev/n

10-1000Hz

play with focus to change beam intensityon CU

BT52, BT53

to be repeated shortly per configuration change

luca

Rate scan

after multiple engine work

C

1.5Gev/n

10-1000Hz

play with focus to change beam intensity on CU

BT50, BT51, BT54

vary periodic trigger frequency to induce pedestal drift

luca, eric g

Tracking performance

nov 18 any time

C,Xe

1.5Gev/n

10-1000Hz

far and near focus

BT50, BT51, BT52

investigate tracking at different rates and angles (0,30,45,60 TBD), scan tower3 w/o ACD tile with ext trigger

leon, INFN

Tracking saturation

nov 18 any time

C,Xe

1.5Gev/n

10-1000Hz

far focus

BT50, BT51

scan different angles (0,30,45,60 TBD), scan tower3 w/o ACD tile with ext trigger

leon, INFN

CAL calibration

nov 18

C,Xe

600MeV/n, 1GeV/n, 1.5GeV/n

100Hz

far and near focus

BT50

verify quenching factors, CAL calibrations, ACD partial calibration

CAL team

CAL calibration comparison with previous results

nov 18

C,Xe

1.5GeV/n

100Hz

far and near focus

BT50, BT51

beam on tower1 to avoid TKR in the line

CAL team

Energy scan

nov 19

C,Xe

600MeV/n - 1.5GeV/n in steps

10-1000Hz

far and near focus

BT51

attempt to simulate different ions by varying ionization energy

nicola

Secondary ions with target

nov 19

Xe

1.5GeV/n

10-1000Hz

far and near focus

BT50

attempt to get different ions by shooting beam through a target - need verification with GSI people

benoit

Charge injection in CAL with beam

nov 19

C

1.5GeV/n

10-1000Hz

far and near focus

BT50

check pedestal restoration with beam ON, explore different beam rates; can use existing CalibGenCAL script

sasha

Charge injection in TKR with beam

nov 19

C

1.5GeV/n

10-1000Hz

far and near focus

BT50

check rate effect in TKR signal; must identify CI script and plots to monitor

leon, TKR team

scintillation measurement in CDE

nov 19

C, Xe?

1.5GeV/n

100Hz

 

NA

place another detector upstream and monitor signal pulse

benoit