Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
eTraveler standards, conventions, best practices documentation. All Camera subsystems must use | 45/2716/15 | Mark/Robert |
|
eTraveler procedure for mechanical assembly of raft electronics boards (attach coldbars and FPGA heat sink) | Done 5/4/16 | Robert | |
eTraveler procedure for raft electronics board initial testing (bring up board and load firmware. Prep for TS-REB testing) | Complete 5/23 | Robert | |
eTraveler procedure for posting RGA results | Complete TBD | Mark/Robert | Coordination with Mark Bostic at SLAC for posting RGA |
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
Finish release of 0266 ICD | 4/27 | Mark |
|
Finish release of Platform ICD | 4/20 | Mark |
|
Finish release of Timing ICD | 5/4 | Mark |
|
Finish release of HPS FRSs | 5/11 | Mark |
|
Finish release of HPS ESDs | 5/11 | Mark |
|
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|---|---|---|
ePix100A detector data sheet | 5/1113 | Mark | |
ePix100A installation guide | 5/1113 | Mark | |
ePix100A detector ops/api guide | 5/1113 | Mark |
|
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|---|---|---|
Summer intern - AIR Elx software library API docs, consider Doxygen | |||
Review permissions scheme for ppareg Confluence space | Mark | ||
Reorg and new navigation scheme for ppareg Confluence spaec | Mark | ||
Run interference with LCLS, LCLS-II doc control and CDR/PDR/FDR and CD* review prep. | Mark |