DeliverableComplete DateResponsibleBlockers/Issues
eTraveler standards, conventions,
best practices documentation. All Camera
subsystems must use
4/27/15Mark/Robert
  • (minus) Consensus from Camera project on core standards
eTraveler procedure for mechanical
assembly of raft electronics boards
(attach coldbars and FPGA heat sink)

Done 5/4/16

Robert 
eTraveler procedure for raft electronics
board initial testing (bring up board and
load firmware. Prep for functional
TS-REB testing)

Complete 5/23

Robert 
eTraveler procedure for posting RGA
results
Complete TBDMark/Robert

Coordination with Mark Bostic at SLAC for posting RGA
results

Medium/long term projects/deliverables

  Done 4/20

DeliverableComplete DateResponsibleBlockers/Issues
Write demo eTraveler procedures to show Walt Innes
how eTraveler can be used to monitor and control aux
elex inventory
RobertDone 4/20/16Robert  
With Walt Innes, plan assembly sequence
and eTraveler procedures for ~500
commercial electronic parts

Complete TBD
(Ongoing)

Robert 
Write eTraveler procedures for inventory control
of commercial elx parts
6/15Robert/Mark 
Write eTraveler procedures for testing of elx assemblies as
needed (e.g. Camera protection system)

Complete TBD

Robert 
Consult with SLAC Camera subsystems (Cryo, CBM,
Shutter, I&T) on assembly sequences, scope and "load balancing"
for writing eTraveler procedures
6/15Mark/Robert 
Plan for Camera operations & maintenance
documentation, relationship to eTraveler
7/15Mark/Robert
  • Project decision on how suitable eT is
    for operations and maintenance

...