DeliverableComplete DateResponsibleBlockers/Issues
eTraveler standards, conventions,
best practices documentation. All Camera
subsystems must use.
4/27/15Mark/Robert
  • (minus) Consensus from Camera project on core standards
eTraveler procedures procedure for mechanical
assembly of raft electronics boards
(attach coldbars and FPGA heat sink)

Done 5/4

Robert 
eTraveler procedure for raft electronics
board initial testing (bring up board and
load firmware. Prep for functional
TS-REB testing)

Complete 5/23

Robert 
eTraveler procedure for posting RGA
results
Complete TBDMark/Robert

???
(~5 days effort left,
waiting on BNL)

Robert(minus) Final assembly process details from BNL

Coordination with Mark Bostic at SLAC for posting RGA
results

Medium/long term projects/deliverables

...

DeliverableComplete DateResponsibleBlockers/Issues
Write demo eTraveler procedures to show Walt Innes
how eTraveler can be used to monitor and control aux
elex inventory
Robert  
With Walt Innes, plan assembly sequence
and eTraveler procedures for ~500
commercial electronic parts
5/15

Complete TBD
(Ongoing)

Robert 
Write eTraveler procedures for inventory control
of commercial elx parts
6/15Robert/Mark 
Write eTraveler procedures for testing of elx assemblies as
needed (e.g. Camera protection system)

Complete TBD

Robert 
Consult with SLAC Camera subsystems (Cryo, CBM,
Shutter, I&T) on assembly sequences, scope and "load balancing"
for writing eTraveler procedures
6/15Mark/Robert 
Plan for Camera operations & maintenance
documentation, relationship to eTraveler
7/15Mark/Robert
  • Project decision on how suitable eT is
    for operations and maintenance

...