...
| Electron | Full Brem | Tagged |
---|---|---|---|
0.5 | |
| 75 k(1287_1289) |
1 | |
| 100k (1276-1279) |
2.5 | | 200k (1262-1271) | 100k (1272-1275) |
Electron runs
Runs | Date | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|
1201 | 11/8 | e- | 2.5 | BT1 | 0° |
| av rate 34 HZ, CU instant rate 500 hz. S0 counts 21k per spîll |
1202 |
| e- | 2.5 | BT1 |
|
| 3 phasing errors for 30k events. run stopped due to beam off |
1204 | 11/8 | e- | 0.5 | |
|
| 20k |
1205 | e- | 1. | S0:14 k count per spill | ||||
1218-1219 | 11/08 | e- | 1. |
| 30° (x,y,z)=(200,13.2,-48) | no | Accidentally started runs in synchronized Run Control. These were automatically aborted by the program. |
1220 | 22h06 | e- | 1. | BT1 | idem | No | 100K, S0 new trigger, S4 off |
1221 | 22h20 | e- | 1. | BT1 | Idem | YES | Refrence point before changing momentum |
1239 | 12/08 | e- | .5 |
| idem |
| 500 MeV electron with magnet off to check dump position with electron beam.9K |
1240 |
| .5 |
| idem |
| 500 MeV electron with magnet off to check dump position with electron beam. | |
1259 | 12/8 | e' | 1. |
|
|
| 1. Gev with magnet off |
1260 | 12/8 |
| 2.5 |
|
|
| magnet off, 2.5 GeV electrons to check beam and CU positions |
1261 | 12/8 |
| 2.5 |
|
|
| Magnet Off |
...
Runs | Date | particle | energy | IMagnet | CU configuration | CU position | AD | notes | |
---|---|---|---|---|---|---|---|---|---|
1200 | 11/8 | e- | 2.5 | 0 |
|
|
| ? Control Room ajustingSpill structure during run | |
1203 | 11/8 | e- | 0.5 | 0 |
|
| | S0 = 13k/spill, wrong focus setting | |
9 mrad on XY 12 mrad on XZ | 1238 | 12/8 |
|
|
|
|
|
| Software test |
1241 | 12/8 |
|
|
|
|
|
| Software test | |
1280 | 13/8 |
|
|
|
|
|
| Test run for CU CAL pedestals - JUNK |
...