Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Full-brem Photon runs

 Runs

 Date

particle

energy

 I(Magnet)

CU configuration

CU position

AD

notes

1183-1190

 8/8
9/8 

e+g

2.5

 600

BT1

0 degrees, center of tower 2

yes 

overall 2M evts evts  - (false report of 300 A for 1185 in elogBook)


 



 





 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tagger calibration runs

 Runs

Date 

particle

energy (GeV)

CU configuration

CU position

AD

notes

 1148-1164; 1166-1169

 8/8

e beam

various

BT1

0 degrees, various positions to align with tagger

yes

many different configurations, for expert only

 1170

 

e beam

1.5

BT1

0 degrees, center of tower 2

 yes

 dump in place, slits at 51.5

 1171

 

e beam

1.25 

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration

 1172

 

e beam

1.125

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration-NOT Synchronised

 1173

 

e beam

 1.375

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration, slits reduce to 51

 1174

 

e beam

1.125 

 BT1

0 degrees, center of tower 2

yes

magnet current 600A, direct tagger calibration

 

 

 

 

 

 

 

 

 CAL calibration runs

 Runs

particle

energy

CU configuration

CU position

AD

notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAL pedestal runs

 Runs

Date 

particle

energy

CU configuration

CU position

AD

notes

 1191

 9/8 8h51

-

-

 BT22 (S3 only)

-

-

monitor pedestal shift

 1165

 8/8

 

 

 BT22(S3 only)

 

 

 pedestal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACD Calibration runs

 Runs

Date 

particle

energy

CU configuration

CU position

AD

notes

 1191

 9/8 8h51

-

-

 BT22 (S3 only)

-

-

monitor pedestal shift

 1165

 8/8

 

 

 BT22(S3 only)

 

  

 pedestal