...
- FE board order update
- Hybrid order update
- Signal flange boardOngoing projects in pipeline
- Power adapter for FE board: do we build final mezzanine board design or a temporary?
Test - flex cable: "breakout" and "pigtail test" cablesSub-projects (link)
- LV power cables (updated estimates)
- LV power flange board design
- Software updates for FE board operation
- ROC testing on Zynq and high rate tests
Updates on APV25 charge injection at UCSC- AOB
Minutes
{"serverDuration": 52, "requestCorrelationId": "0ef7c7ec62f8d03d"}