...
- FE board order update
- Hybrid order update
- Signal flange board
- Ongoing projects in pipeline
- Power adapter for FE board: do we build final mezzanine board design or a temporary?
- Test flex cable: "breakout" and "pigtail test" cables
- External LV power cables (updated estimates)
- LV power flange board design
- Software updates for FE board operation
- ROC testing on Zynq and high rate tests
- Updates on APV25 charge injection at UCSC
- AOB
Minutes
{"serverDuration": 48, "requestCorrelationId": "36e249b9630077ac"}