Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • FE board order update
  • Hybrid order update
  • Signal flange board
  • Ongoing projects in pipeline
    • Power adapter for FE board: do we build final mezzanine board design or a temporary?
    • Test flex cable: "breakout" and "pigtail test" cables
    • External LV power cables (updated estimates)
    • LV power flange board design
    • Software updates for FE board operation
    • ROC testing on Zynq and high rate tests 
  • Updates on APV25 charge injection at UCSC
  • AOB

 

Minutes