Update 07/29 (JB) : Last night we investigated and found a feature of the end2endBT script, which consequence is that the GCFE config_1 register is overwritten using the content of the lates_trg_FMxxx.xml files. The registers were set so as to disable CAL_HI. We updated the lates_trg_FMxxx.xml to 0x7 (mandatory value to enable CAL_HI and CAL_LO) and were able to see the CAL_HI firefing as expected. A run was done with the CU at 90deg to have high energy deposit and we could check that the CAL_HI trigger request fall nicely within the trigger windows (see that nigh shift confluence page). The conclusion is that from run 700000820 the CAL_HI trigger is enabled and should fire asap.

Update 07/31 (JB) : we now have the following FHE thresholds in MeV associated with the following BT configurations :
FHE(MeV)        BT-#
500             17
750             18
1000            16
1500            19
2000            20
Please check the confluence DataTaking>Configuration page to see the details of these configurations. All the threshold files have been generated with the latest version of CalibGenCAL (v4r2p4?) and they passed the validation scripts.
So as soon as the beam is ready we can start study the FHE efficiency.

 

Predictions from MC Simulations

...