FE board and Hybrid:
Ben reported that Tung has started to look at the hybrid layout and found some issues that they would go over.
Ryan said that he will sit down with Tung on Monday to go over scheduling and priorities as there are many boards being layed out at the moment and he'll let us know what the plan will be.
Slow control
Pelle showed a first list of channels for the slow control of the SVT DAQ. Needs to add power for flange boards and a monitoring channel for the internal hybrid voltage monitoring (if used). Will send to Hovanes before Monday.
Test beam in NLCTA
Pelle showed a couple of slides of the NLCTA area that will be used to run a test beam to test the sensor susceptibility for acute damage from large charge depositions (to simulate beam accident at JLab). Basic plan exists.
We'll have to make sure our PC can be setup with a new IP number.
Sho will help Pelle setup remote (RS232) control of the Keithly HV supply.
Pelle will ask for help when he knows more details.
The plan is to install whenever we have a stand that we can use. Hopefully next week .Data taking the week after most likely.