...
Date | Time | Run | E-log | Description | |
---|---|---|---|---|---|
26/4/11 | 00:30 | 188242 | CSC link lock failed for CSC EC sectors 2,12 in run 188242 | ||
23/4/11 | 12:08 |
| Replaced SPU B0 in ROD slot A06: fixes data integrity for Sector A02 Layer 1 |
| |
21/4/11 | 21:03 | 180124 | CSC related DAQ (monitoring) issues (CSC ADC time spikes and fit fail flag not propagating upwards ?) | ||
20/4/11 | 18:41 |
| high rate test of CSC DPU code modification | ||
18/4/11 | 12:41 |
| Change in OKS database (CSC main controlled moved from private machine to online machine) | ||
13/4/11 | 19:08 |
| CSC high rate test (busy 4.5% @ 75Khz after initial confusion of a hot channel) | ||
5/4/11 | 17:18 | 178992 | CSC errors during run 178992 | ||
1/4/11 | 7:59 |
| OHP (large fraction of bad data - due to A01-02 losing HV) |