This page collects information about the SLAC involvement in the read-out of the Cathode Strip Chambers, which is one of ATLAS's four muon systems and designed to provide precision measurements in the forward region.
Date |
Time |
Run |
E-log |
Description |
|
---|---|---|---|---|---|
26/4/11 |
00:30 |
188242 |
CSC link lock failed for CSC EC sectors 2,12 in run 188242 |
||
23/4/11 |
12:08 |
|
Replaced SPU B0 in ROD slot A06: fixes data integrity for Sector A02 Layer 1 |
|
|
21/4/11 |
21:03 |
180124 |
CSC related DAQ (monitoring) issues (CSC ADC time spikes and fit fail flag not propagating upwards ?) |
||
20/4/11 |
18:41 |
|
high rate test of CSC DPU code modification |
||
18/4/11 |
12:41 |
|
Change in OKS database (CSC main controlled moved from private machine to online machine) |
||
13/4/11 |
19:08 |
|
CSC high rate test (busy 4.5% @ 75Khz after initial confusion of a hot channel) |
||
5/4/11 |
17:18 |
178992 |
CSC errors during run 178992 |
||
1/4/11 |
7:59 |
|
OHP (large fraction of bad data - due to A01-02 losing HV) |