Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

SW Test Plan: Switch LI20-LI30 CAMAC to EPICS

1. Description/Purpose:

After the LCLS accelerator has been checked out and tuned up using the SLC control system, we would like to begin switching the sectors back to EPICS control to test and if all goes well, leave them in EPICS control.

...

C. If B goes well, 2 or more days later, switch over remaining sectors. 3 hours

2. Systems Affected:

SCP Control of Sectors 20-30 Klystrons and other CAMAC devices

3. Beam Required:

Yes, and klystrons active on the beam

4. Invasive:

Yes

5. Test time needed:

9 hours distributed over 3 separate days

6. Dependencies:

None

7. When:

Week of May 16 or later

8. Test plan:

(Pre-test) save SCP configs to restore afer test is complete.

...

e. Restart MDL loop (need to add this to script) 

f. Test!

10. Backout plan:

a. For each sector, go to lclshome > LI**/Network > More CAMAC... >
Switch to SCP Control

...