Status chronology

  • 3/29/2011 - Due to some hidden I/O problems, two changes have been made to this task, neither of which should affect data content. Note that this change will take effect on runs after 321756673, or any runs rolled back after this date.

    Package

    Old Version

    New Version

    Reason for change

    GPLtools

    v1r15p1

    GPLtools-02-00-00

    Checks size of files before and after move between disk and xroot

    skimmer

    07-07-00

    08-01-00

    detects failure to open input file

  • 3/17/2011 - Last block complete (one instance of skimmer failure in mergeClumps)
  • 3/15/2011 - Expand P120 to present (last run 321756673, 2011-03-14 00:51:11 UTC). Three runs continue to be dummied out. Once those runs have proper RECON files, their streams can be rolled back.

    run

    task stream

    # subStreams

    306353950

    11624

    10

    316611240

    13431

    8

    320850543

    14171

    7

  • 2/4/2011 - Expand P120 to present (last run 318211122, 2011-01-31 23:58:40 UTC). This include three runs for which there are no Recon files which have, for the moment, been supplied with 'dummy' entries in the runFile.:

    306353950

    'bad chunk' (known previously) - awaiting GR update

    313483912

    missing 700s, being worked on

    316611240

    'bad chunk' - awaiting GR update

  • 1/12/2011 - Expand P120 coverage to include Crab ToO
    • Crab ToO 9/23/2010 15:50:50 to 9/27/2010 19:49:38, corresponding to MET r0306949696-r0307308940
    • reconfig through end of Sep 2010: 10916 -> 11841 runs, increase of 925 runs
    • No recon file for run 306353950 (being worked on, for the moment, place dummy file in runFile.txt)
    • First run in new block completed, awaiting checkered flag to continue...
  • 8/29/2010 - Discovered three merge steps that silently failed (xroot file access). TASK complete.
  • 8/28/2010 - processing formally complete (10916 runs), but some discrepancy in # of events
  • 8/26/2010 - serious xroot problems. See initial distribution of files across xroot servers. From this report (courtesy Wilko) it is easy to see where problems are likely to arise - when the number of servers involved is small, e.g. two or three.
  • 8/19/2010 - production continues at a crawl due to xroot server difficulties
  • 8/16/2010 - resume full production, but at a slow trickle (max 350 simultaneous processClump jobs)
  • 8/8/2010 - block 2 reprocessing complete. Many xroot server problems. (5 days to process 2084 runs)
  • 8/3/2010 - begin block 2 reprocessing (through 255132033 MET), bringing the total runs reprocessed to 2721, about 5-1/2 months of data.
  • 7/28/2010 - block 1 re-reprocessing complete
  • 7/27/2010 - New GlastRelease (v17r35p10) containing new evtUtils, "to make the FT1EventClass bits compatible with the ScienceTools". Cleanup, including removing all files created last week during the first attempt.
  • 7/21/2010 - block 1 reprocessing complete
  • 7/20/2010 - agree upon 'pilot block' of runs (239557417 - 243220241), 637 runs. Begin...
  • 7/19/2010 - submit first test run. success. await feedback

...