Note

  • Downconverter:
    • 2856MHz: rev A01 (379-396-16-C03_A01)
    • 2600MHz: rev A03 (379-396-16-C03_A03)
  • Upconverter:
    • 2856 MHz: rev A01 (379-156-06-C00_A01)
    • 2600MHz: rev A03 (379-156-06-C00_A03)
  • This is a list of boards that still need to be delivered for each facility, not how many boards we have ordered.


LCLS Accelerator

Facility

Carrier

RF Interlock RTM

Digital Debug RTM

Down Converter

Up Converter

Required Delivery Date

Phase Cavity

 

 

 1

1 x rev A01 (Installed)

1 x rev A01 (Installed)

1 x rev A03 (Installed)

1 x rev A03

1 x rev A01 (Installed)

1 x rev A01 (Installed)

1 x rev A03 (Installed)

1 x rev A03

Digital Debug RTM x1, Downconverter rev A03 x1,

Upconverter rev A03 x1

by 9/25/2023

expected: 9/27/23-Stephen

Currently reworking boards

Laser Locker

 

 

 

 

 

All delivered

XTCAV


3


3 x rev A01

3 x rev A01

(Expecting RF Interlock RTM x1 is already delivered to Thuy)

Upconverter rev A01 x3, Downconverter rev A01 x 3

Delivered 10/17/23

STCAV

1

1


1 x rev A01

1 x rev A01

Carrier x1 & RF Interlock RTM x1 is already delivered to Thuy

Upconverter rev A01 x1, Downconverter rev A01 x1

by Nov. 2023 Downtime

LINAC LLRF Position 26-3

 1

 

1 x rev A01

1 x rev A01

All delivered

 

FACET

Facility

Carrier

RF Interlock RTM

Digital Debug RTM

Down Converter

Up Converter

Required Delivery Date

FACET 1  (Installed)1  (Installed)
1 x rev A01 (Installed)1 x rev A01 (Installed)All delivered








UED

Facility

Carrier

RF Interlock RTM

Digital Debug RTM

Down Converter

Up Converter

Required Delivery Date
















Test Stands

Facility

Carrier

RF Interlock RTM

Digital Debug RTM

Down Converter

Up Converter

Required Delivery Date
















LCLS Experiment Hutches

Facility

Carrier

RF Interlock RTM

Digital Debug RTM

Down Converter

Up Converter

Required Delivery Date

Laser Locker




All delivered