02/16
Things to improve, discussions during the beam
- We need to create a procedure to install and check the detector at the beam
- How to install the detector, PD, oscilloscope
- How to time in the detector
- ...
- LCLS-II and LCLS I DAQ mingle is problematic for the timing. Philip showed some 5 pedestals that do show a dual band. This could be tested if using LCLS-II only timing
- The scripts that Matt generates for creating multiple daq triggers from the same run trigger (–daq) option does not get the beam properly timed. The x-ray pulse is off by one of more pulses
- Sent message to Matt
- Need to make sure dataSendStreched pulsed is available into the DAQ
- How can we be more deterministic about determining the quality of the detector