02/16

Things to improve, discussions during the beam

  • We need to create a procedure to install and check the detector at the beam 
    • How to install the detector, PD, oscilloscope
    • How to time in the detector
    • ...
  • LCLS-II and LCLS I DAQ mingle is problematic for the timing. Philip showed some 5 pedestals that do show a dual band. This could be tested if using LCLS-II only timing
  • The scripts that Matt generates for creating multiple daq triggers from the same run trigger (–daq) option does not get the beam properly timed. The x-ray pulse is off by one of more pulses
    • Sent message to Matt
    • Need to make sure dataSendStreched pulsed is available into the DAQ
  • How can we be more deterministic about determining the quality of the detector
  • No labels