------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents
e.g. Lowest: AVDD - 100 mA, Top, Hybrid 3, V125 - ...
     Highest: AVDD - 400 mA, Bottom, Hybrid 5, V125 - ...

Lowest:
Highest:

Check high voltage setting for each module (should be 180 V) (OK?):

Check SVT module temperature, write down highest and lowest temperature
e.g. Lowest: FPGA 3, Hybrid 0, 19.2 C, Highest FPGA 5, Hybrid 1, 24.3 C
Note: FPGA 5, Hybrid 1 is not in use and should be 0.

Check temperature at the vacuum chamber input and output:

            [Temperature (C)]
Input:
Output:

ECal status (e.g. Do all HV look ok? etc.):

Trigger Type (e.g. Single Cluster Trigger Top):

Trigger Rate:

 Pair spectrometer magnet:
         [Current]   [B-field]
Value:

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift (Closest measurement to Pair spectrometer):

SVT plans for the shift (Closest measurement to Pair spectrometer):

Notes from previous shifter:

 
  • No labels