Hybrid Baseline Configuration Tests

L0M19 Hybrid baseline_config Test:
Power supply readings after loading baseline_config_L0.xml
4/4 APVs Synced
(V) | (A)
AVDD: 2.50 | 0.289
DVDD: 2.50 | 0.252
V125: 1.25 | 0.236
FPGA: 5.52 | 1.14

Baseline config run successful.

L0M19 hybrid icalScal:
Successful at 120Hz scan


  • No labels