1 - Work Plan of the group

We establish the list of tasks for the group: ECal-WorkGroup.pdf

2 - Proposal schedules (both DOE and the French one)

R. Dupre will apply for a French grant (ANR JCJC) in order to get money for
the ECal project and develop the monitoring system and the various upgrades
planned for ECal. The dead line is January 17th, therefore, it will be
prepared in parallel with the DOE grant within the ECal group.
In particular, we need to develop strong cases to justify the various
expenses proposed for the ECal.

3 - Monitoring system for the ECal

The design of the calorimeter allows for optic fibers to be connected to
cristals in order to monitor the gain. We want to use LED lights in order
to perform the gain monitoring, moreover the use of two colors (blue and
red) should allow to identify loss of transparency from the cristals from
other variations.

  • No labels