Time and Location

2pm Eastern time

Room B101 in F-wing at JLab

Agenda

  • Announcements
  • EPICS repository and build tree status (Wesley)
  • Scaler waveform ROOT readout status (Hovanes)
  • Status of the chiller cooling system document (Marco)
  • Ongoing work on chiller controls (Wesley)
  • SVT time line discussion (Takashi)
    1. Feb2 - ship to jlab (beginning)
    2. Feb 9 - reassemble in EEL and check (beginning)
    3. Feb 23 - Install in the hall.
  • Manpower plan for the preparation and for the running in spring.
  • Other items