Nathan reminded us of the steps to unblinding. The analysis note and committee agreement is the principal requirement.
The outstanding issue is believable and checkable WAB and trident MC. We'll need WAB and trident rates, the radiative fraction, SVT efficiency corrections enabled, and major systematics addressed before a full result is ready.
4. ECal Upgrade? Tim reviewed his motives in opening the question of whether we should be considering a modest ECal upgrade which would improve ECal acceptance. Everyone agreed that there is a motive to look, but that real studies need to be done before we can have a substantive discussion. Enthusiasm was expressed for the positron trigger idea presented by Rafo at last Wednesday's HPS meeting.
Respectfully submitted,
John
EC Chair