Search/Navigation:
Related:
SLAC/EPP/HPS Public
Jefferson Lab/Hall B/HPS Run Wiki
S30XL-LESA/LDMX
Present: Stepan, John, Omar, Maurik, Marzio, Rafo, Tim
The Neutron detectors used for CLAS12 SVT will be installed for HPS, everything is available. Readout controller for the hodoscope test in the EEL building. For SVT, work on FEBs continues, regulators must be changed, looking for a replacement. Similar problem with a digital potentiometer, looking into the design.
All ECal changes will be merged into master this week. The same for the tracking and we hope in January will have a new code and work on the performance issues. Need feedback from the analysis group before thinking about the production. An action list is needed (e.g. track finding efficiency, momentum reconstruction ...).
We will aim to finalize and send to the collaboration for comments by year-end. EC discussions will go till Monday.
Will leave for next year.