Webex meeting for those not at SLAC: https://confluence.slac.stanford.edu/display/hpsg/Webex+connection+details

Agenda
  • FE board: news on layout? news on radiation dose estimates?
  • Charge injection jig (Forest)
  • Test run studies (Omar)
  • Power supplies: update on cabling (pic1)
  • Discussion/brainstorming on requirements on flange board connections and strain relief
    • HV redel connector (same on PS side): non-magnetic, testing for vacuum (expect ok)): (HV redel-link,)
    • HV wire (FEP, testing for vacuum): pic
    • LV connectors on PS side is sub-D 37
    • Sketch of flange board from Ryan: (flange-test-sketch,)
    • Drawing of vacuum box (vacuum box)
    • Pics from TB (pic1,pic2)
  • Feedback on DAQ section in NIM paper
  • AOB

 

Minutes

 

  • No labels