Present: Maurik, Tim, Omar, Rafo, Marzio, Stepan

  • News: SLAC started travel arrangements, but looks like it is a long tedious process. Not clear when travel will be approved. JLAB is in Medcon-4, user registration started.
  • Preparations for the upcoming run - Tim/Rafo/Marzio/Stepan

The first module was completed and send SC, wire-bonding, and testing is done. Work is in progress with sensors, working on mitigation with bias voltage limits. First FEBs will arrive this week. Testing will be done with a couple of FEBs before loading all of them. preliminary results should be available by end of this week.

Work in Hall-B moving well. Magnet is on the beam, new bearings are installed to allow rotations. The 2H02 girder on the beamline with the new collimator installed and tested. Vacuum check is expected to be done today-tomorrow and the fiducialization on Wednesday. Work on hodo will be tomorrow and Wednesday.  

Work on the trigger is ongoing, simulations are done by Sam and Tongtong.

  • Update on shifts, registration of users - Maurik/Marzio

People started to register and get 2-factor authentication. Nathan set up a page to test the connection and use of VNC. List 

  • Collaboration meeting, June 23-25, or not - Stepan

The draft agenda will be circulated in few days.

  • Update on 2016 analysis, the status of publication - Tim

From Matt G. "The 100% limits look pretty much as expected from the scaling of 10%-100%...I’ll send some plots around as soon as I’m satisfied."

  • Update on 2019 data processing - Norman/Omar
  • AOB 


  • No labels