Present:  Marzio, Norman, Rafo, John, Tim, Stepan, Maurik, Cameron, Matt G., Omar

  • News 
    • FWP for next year was submitted to DOE, that included also rest of the funding for this year.
    • Both JLAB and SLAC are looking for a resumption of operations. SLAC will have on-site tests and will provide twp masks for the first day. 
  • HPS presentation at the JLAB users meeting on June 22-24 - PCC proposal for Matt Solt to give the presentation was approved
  • Update on 2016 analysis, a path for releasing the data - Matt G.
    • we burned all the contingency in time, most likely will not be able to release vertexing results before the PAC deadline and for the JUG meeting.
    • Vertexing analysis, unblinded? - John    
      The review committee will meet this Friday, it is too late, they already have seen the analysis note, only answers to the questions from the previous cycle must be revied. Will check wit the committee if at least part for the unblinding can be expedited  
    • Resonance Search, finishing the analysis - Omar/Rafo/Cameron
      The statistical analysis (asymptotic CL) gave higher P-values (lower excursions). The issue with the size of the window still remains. Decided to test -1\sogma and -2\sigma window sizes and conclude the results.
  • Status of 2019 MC and calibration - Marzio/Norman/MattG./Omar 
    Still in works, MC for 2019 is done and ready for the reach estimate
  • Update on PAC and the jeopardy document - Stepan
    The document is on the overleaf and contributors can start writing.  
  • aob
  • No labels