Present: Stepan, Norman, Rafo, Tim, Marzio, John, Maurik, Omar
Started with European collaborators, need a week to finish the list. Then will ping US collaborators.
Bulding and testing the Hybrids are in progress. Two cards are at SLAC, need to send the cables with the third card. ECal is connected, chiller, HV and LV, gettign ready for cosmic calibrations. Hodoscope is waiting for wrapping of the second tile.
The review committee is evaluating the new note, will take about 10 days.