Search/Navigation:
Related:
SLAC/EPP/HPS Public
Jefferson Lab/Hall B/HPS Run Wiki
S30XL-LESA/LDMX
Present:
MC is moving along well, a large set is generated including digitization, validation is needed. Calibration is going a bit slow, the main issue is with the alignment. The 2nd and 3rd bullets of the above list can be done without perfect alignment. Need to clarify with Matt what exactly is needed for reach estimate.