Present:  Tim, Stepan, Rafayel, John, Raphael, Omar, Maurik

  • Next Collaboration meeting dates: Week of May 11 or May 18 - Stepan
    May 14, 15 and 16
  • SVT work, when - May? - Tim
    SVT work starts on May 11. SVT will be moved to the cleanroom in EEL and will be stored in a freezer
  • Proposal update for PAC48 - Stepan
    Will need input on contributors and the overall structure
  • Update on 2016 analysis 
    Vertexing analysis - John: so far things are going very well, expect to finalize selection cuts in a couple of weeks. There new cuts that need to be studied. The biggest issue perhaps is in the simulation-data discrepancy regarding the high z events. More on the analysis and presentation at the workshop 
    Resonance Search - Omar (Rafo): analysis is progressing well, data/MC agreement is within 10%-15% without L1 requirement for positron track. The study of mass distribution is in progress by Kyle and Cameron using 10% unblinded sample. The large run-2-run fluctuations were traced to    
  • where we are with the calibration of 2019 data and 2019 MC - Marzio/Raphael
    Progress is slow due to the limited manpower, MC needs a trigger simulation 
  • aob