Date
Attendees
Discussion items
- Lost S8-10 search
- Search is 30 mins, interlock checks 30 mins
- Hopefully recovering before shift change
- HE cryomodule RF inspection tomorrow
- Plan is to get everyone more involved so we can share the load
- Lauren, Ryan, and James will do the checkout tomorrow
- Nicole will help next time
- PIP-II project review next week
- Sebastian on travel all week
- James traveling too
- On-call shifts on the calendar
- Lauren is at JLab April 18-26
- Assuming all goes well
- Cooldown starting Monday
- Ready to test on Friday
- Next JLab test for this month likely wiped off the schedule, so this test might run longer
- Question: how many working SSAs does JLab have with the isolator problem?
- JLab is repairing LCW pumps, flushing the isolators, drying them out, per the last email James got
- Meeting next week canceled due to Sebastian’s travel
- CM01 updates?
- Not really - interesting that there are small changes in other cavities
- CM01 is by far the most surprising/severe
- Looking at rate of rise of field emission vs. MV