Attendees:  Leinani, Elena,Josh, Rebecca, Armin, Dennis, Will

Announcements:

  • Rebecca out June 27-July8


Discussion:


  • Mirror Substrates TPRR - received report - updating drawings and ESDs- aiming to complete by end of week
    • procurements -
      • Req started for substrates (number?)
      • ASP started
    • Eliazar will approve on Armin's behalf
  • Laser Transport EPR  -  report received from Brice
    • FEH configuration updates
    • 400W baseline
  • Lasers PDR - Week of July 15?
    • Doc preparation
    • Slides being prepared
  • LCLS FEH workshop -
    • FEH laser room layout preferences (2 proposals for A/E to review)
      • not clear on long term needs?
      • Joe to reach out to leads
    • rackspace - Mitchell met with Omar(IT/Data), Matt(BCS), (PPS) - follow ups next week? stakeholders needing space first
    • BCS needs to confirm spac requirements
  • Infrastructure -
  • Mechanical -
    • Elena working through collimator supports
      • CXi is adding a collimator next to PC2L5, PC2L4
      • BTm connectors interfering?
    • Design of shielding in hutch 4 - waiting for final requirements but basic design near completion
      • developing 2D drawings
      • BIO seismic
    • BCS sensor counts - looking at gate valve ties, etc
      • need to look at diffraction issues in the hutch
        • Mirror- is there a published note? MFX specific? Will will generate? Or edit DXS note?
        • redundant sensors?
    • XPP style Side boards would work for lasers?
      • ejection and ATM
      • Mechanical team will engineer these systems (jim charge laser number?)/ Laser team will assist with analysis
    • ATM reversal - which model number would we end up with? Leinani send part numbers to Jim/Elena -34755?
    • Reference laser reversal - backpack and laser on same side??? - Leinani
    • MODS table updated.
    • Components to be added to tables


  • No labels